Manitoba Hydro
Manitoba Hydro
Manitoba
Design, Supply, Install, Mechanical, Electrical, Piping, HVAC
This project was completed for Manitoba Hydro under the Bipole 3 Converter Station Project. This phase of this project includes the following details:
The supply of all design and engineering of water storage facilities and a potable water treatment plant for a 600 man start up construction camp near Gillam, MB. This design-build system consisted of a domestic water filtration system that is automated and controlled by a monitoring PLC program. Domestic and fire water storage consists of 4 equally sized above-ground steel welded, and insulated tanks. Each system distributes water to the 600 man camp through separate distribution pipes.
The manufacture, construction, testing and commissioning of a potable water treatment plant (“WTP”) at the start up camp (S2) for the Bipole 3 Converter Station Project. The second phase of this project includes the onsite installation of the above water treatment facilities.
$4,488,850